{"id":11765,"date":"2021-04-07T08:28:27","date_gmt":"2021-04-07T07:28:27","guid":{"rendered":"https:\/\/maneold.freewayweb.it\/?p=11765"},"modified":"2021-04-07T08:28:27","modified_gmt":"2021-04-07T07:28:27","slug":"the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed","status":"publish","type":"post","link":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/","title":{"rendered":"The extension and renovation works of Padiglione \u201cGuardia\u201d &#8211; Policlinico di Milano &#8211; have been completed"},"content":{"rendered":"<p>After 8 long years, the works on the renovated &#8220;Guardia&#8221; pavilion have been completed and all services and departments have been transferred.<\/p>\n<p>The intervention was long and difficult because it was carried out in stages, ensuring the continuity of the functions that could not be transferred.<\/p>\n<p>The intervention includes, on the south side, the realization of a new building in the old pavilion &#8220;Pasini&#8221; area, with a surface of about 11,500 m\u00b2, developed on a basement, an underground floor and 3 floors above ground; while on the north side the existing pavilion &#8220;Guardia&#8221; has been completely renovated, including &#8211; in about 6,000 m\u00b2 &#8211; an operating group with 4 rooms, one of which hybrid, a diagnostic area, an endoscopic area with 5 rooms and an intensive care area with 14 beds. Finally, on the first floor, a covered square with a large transparent roof has been created for the CUP (Centro Unico Prenotazioni) of the hospital.<\/p>\n<p>From the architectural point of view, the new and the existing part are connected each other on a single raised basement that links the two volumes, creating in the central area an open space for access to various services and departments.<\/p>\n<p>From the technological point of view, the complex is equipped with its own independent refrigeration production system, while it is connected to the centralized hospital network for what concerns hot fluids.<\/p>\n<p>Despite its small size, the intervention was very complicated, because of its position in a strategic area of the hospital close to one of the entrances to the hospital and because the works involved high-intensity areas implemented, at least for a part, within an existing building, strongly influenced by structural constraints and archeological findings.<\/p>\n<p>Manens-Tifs, thanks to its huge experience in the sector of existing healthcare complexes renovation, has given a fundamental contribution to the realization of works, providing all the MEP systems design and site supervision activities.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-medium wp-image-11767\" src=\"http:\/\/manens.com\/wp-content\/uploads\/2021\/04\/1-300x227.jpg\" alt=\"\" width=\"300\" height=\"227\" srcset=\"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/1-300x227.jpg 300w, https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/1.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img decoding=\"async\" class=\"alignnone size-medium wp-image-11768\" src=\"http:\/\/manens.com\/wp-content\/uploads\/2021\/04\/2-300x227.jpg\" alt=\"\" width=\"300\" height=\"227\" srcset=\"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/2-300x227.jpg 300w, https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/2.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img decoding=\"async\" class=\"alignnone size-medium wp-image-11769\" src=\"http:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Immagine2-300x226.jpg\" alt=\"\" width=\"300\" height=\"226\" srcset=\"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Immagine2-300x226.jpg 300w, https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Immagine2.jpg 553w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-11770\" src=\"http:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Immagine4-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Immagine4-300x225.jpg 300w, https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Immagine4.jpg 433w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>After 8 long years, the works on the renovated &#8220;Guardia&#8221; pavilion have been completed and all services and departments have been transferred. The intervention was long and difficult because it was carried out in stages, ensuring the continuity of the functions that could not be transferred. The intervention includes, on the south side, the realization [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":11771,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[140],"tags":[259,204,260],"class_list":["post-11765","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects","tag-guardia","tag-milan","tag-pavillion"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The extension and renovation works of Padiglione \u201cGuardia\u201d - Policlinico di Milano - have been completed - Manens<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The extension and renovation works of Padiglione \u201cGuardia\u201d - Policlinico di Milano - have been completed - Manens\" \/>\n<meta property=\"og:description\" content=\"After 8 long years, the works on the renovated &#8220;Guardia&#8221; pavilion have been completed and all services and departments have been transferred. The intervention was long and difficult because it was carried out in stages, ensuring the continuity of the functions that could not be transferred. The intervention includes, on the south side, the realization [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/\" \/>\n<meta property=\"og:site_name\" content=\"Manens\" \/>\n<meta property=\"article:published_time\" content=\"2021-04-07T07:28:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Cattura.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1439\" \/>\n\t<meta property=\"og:image:height\" content=\"696\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Claudia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Claudia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/\"},\"author\":{\"name\":\"Claudia\",\"@id\":\"https:\/\/manens.com\/#\/schema\/person\/45f1473aa8b2169f0c44d5fd7d369e41\"},\"headline\":\"The extension and renovation works of Padiglione \u201cGuardia\u201d &#8211; Policlinico di Milano &#8211; have been completed\",\"datePublished\":\"2021-04-07T07:28:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/\"},\"wordCount\":325,\"publisher\":{\"@id\":\"https:\/\/manens.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Cattura.jpg\",\"keywords\":[\"Guardia\",\"milan\",\"pavillion\"],\"articleSection\":[\"Projects\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/\",\"url\":\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/\",\"name\":\"The extension and renovation works of Padiglione \u201cGuardia\u201d - Policlinico di Milano - have been completed - Manens\",\"isPartOf\":{\"@id\":\"https:\/\/manens.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Cattura.jpg\",\"datePublished\":\"2021-04-07T07:28:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#primaryimage\",\"url\":\"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Cattura.jpg\",\"contentUrl\":\"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Cattura.jpg\",\"width\":1439,\"height\":696,\"caption\":\"Guardia Pavillion - Policlinico Milano\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/manens.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"The extension and renovation works of Padiglione \u201cGuardia\u201d &#8211; Policlinico di Milano &#8211; have been completed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/manens.com\/#website\",\"url\":\"https:\/\/manens.com\/\",\"name\":\"Manens\",\"description\":\"Engineering &amp; Architecture\",\"publisher\":{\"@id\":\"https:\/\/manens.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/manens.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/manens.com\/#organization\",\"name\":\"Manens\",\"url\":\"https:\/\/manens.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/manens.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/manens.com\/wp-content\/uploads\/2023\/04\/cropped-cropped-cropped-cropped-logo-manens-1-1.png\",\"contentUrl\":\"https:\/\/manens.com\/wp-content\/uploads\/2023\/04\/cropped-cropped-cropped-cropped-logo-manens-1-1.png\",\"width\":591,\"height\":148,\"caption\":\"Manens\"},\"image\":{\"@id\":\"https:\/\/manens.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.linkedin.com\/company\/manens-spa\/\",\"https:\/\/www.youtube.com\/channel\/UCo84luDkTV06zhvdf7FT3mQ\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/manens.com\/#\/schema\/person\/45f1473aa8b2169f0c44d5fd7d369e41\",\"name\":\"Claudia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/manens.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/a34ef3ba9b23917833341101fa8b669685bd9144c183811efcf8c0afcbe21aed?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/a34ef3ba9b23917833341101fa8b669685bd9144c183811efcf8c0afcbe21aed?s=96&d=mm&r=g\",\"caption\":\"Claudia\"},\"url\":\"https:\/\/manens.com\/en\/author\/claudia\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The extension and renovation works of Padiglione \u201cGuardia\u201d - Policlinico di Milano - have been completed - Manens","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/","og_locale":"en_US","og_type":"article","og_title":"The extension and renovation works of Padiglione \u201cGuardia\u201d - Policlinico di Milano - have been completed - Manens","og_description":"After 8 long years, the works on the renovated &#8220;Guardia&#8221; pavilion have been completed and all services and departments have been transferred. The intervention was long and difficult because it was carried out in stages, ensuring the continuity of the functions that could not be transferred. The intervention includes, on the south side, the realization [&hellip;]","og_url":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/","og_site_name":"Manens","article_published_time":"2021-04-07T07:28:27+00:00","og_image":[{"width":1439,"height":696,"url":"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Cattura.jpg","type":"image\/jpeg"}],"author":"Claudia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Claudia","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#article","isPartOf":{"@id":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/"},"author":{"name":"Claudia","@id":"https:\/\/manens.com\/#\/schema\/person\/45f1473aa8b2169f0c44d5fd7d369e41"},"headline":"The extension and renovation works of Padiglione \u201cGuardia\u201d &#8211; Policlinico di Milano &#8211; have been completed","datePublished":"2021-04-07T07:28:27+00:00","mainEntityOfPage":{"@id":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/"},"wordCount":325,"publisher":{"@id":"https:\/\/manens.com\/#organization"},"image":{"@id":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#primaryimage"},"thumbnailUrl":"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Cattura.jpg","keywords":["Guardia","milan","pavillion"],"articleSection":["Projects"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/","url":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/","name":"The extension and renovation works of Padiglione \u201cGuardia\u201d - Policlinico di Milano - have been completed - Manens","isPartOf":{"@id":"https:\/\/manens.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#primaryimage"},"image":{"@id":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#primaryimage"},"thumbnailUrl":"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Cattura.jpg","datePublished":"2021-04-07T07:28:27+00:00","breadcrumb":{"@id":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#primaryimage","url":"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Cattura.jpg","contentUrl":"https:\/\/manens.com\/wp-content\/uploads\/2021\/04\/Cattura.jpg","width":1439,"height":696,"caption":"Guardia Pavillion - Policlinico Milano"},{"@type":"BreadcrumbList","@id":"https:\/\/manens.com\/en\/projects\/the-extension-and-renovation-works-of-padiglione-guardia-policlinico-di-milano-have-been-completed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/manens.com\/"},{"@type":"ListItem","position":2,"name":"The extension and renovation works of Padiglione \u201cGuardia\u201d &#8211; Policlinico di Milano &#8211; have been completed"}]},{"@type":"WebSite","@id":"https:\/\/manens.com\/#website","url":"https:\/\/manens.com\/","name":"Manens","description":"Engineering &amp; Architecture","publisher":{"@id":"https:\/\/manens.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/manens.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/manens.com\/#organization","name":"Manens","url":"https:\/\/manens.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/manens.com\/#\/schema\/logo\/image\/","url":"https:\/\/manens.com\/wp-content\/uploads\/2023\/04\/cropped-cropped-cropped-cropped-logo-manens-1-1.png","contentUrl":"https:\/\/manens.com\/wp-content\/uploads\/2023\/04\/cropped-cropped-cropped-cropped-logo-manens-1-1.png","width":591,"height":148,"caption":"Manens"},"image":{"@id":"https:\/\/manens.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/manens-spa\/","https:\/\/www.youtube.com\/channel\/UCo84luDkTV06zhvdf7FT3mQ"]},{"@type":"Person","@id":"https:\/\/manens.com\/#\/schema\/person\/45f1473aa8b2169f0c44d5fd7d369e41","name":"Claudia","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/manens.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/a34ef3ba9b23917833341101fa8b669685bd9144c183811efcf8c0afcbe21aed?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a34ef3ba9b23917833341101fa8b669685bd9144c183811efcf8c0afcbe21aed?s=96&d=mm&r=g","caption":"Claudia"},"url":"https:\/\/manens.com\/en\/author\/claudia\/"}]}},"_links":{"self":[{"href":"https:\/\/manens.com\/en\/wp-json\/wp\/v2\/posts\/11765","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/manens.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/manens.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/manens.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/manens.com\/en\/wp-json\/wp\/v2\/comments?post=11765"}],"version-history":[{"count":0,"href":"https:\/\/manens.com\/en\/wp-json\/wp\/v2\/posts\/11765\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/manens.com\/en\/wp-json\/wp\/v2\/media\/11771"}],"wp:attachment":[{"href":"https:\/\/manens.com\/en\/wp-json\/wp\/v2\/media?parent=11765"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/manens.com\/en\/wp-json\/wp\/v2\/categories?post=11765"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/manens.com\/en\/wp-json\/wp\/v2\/tags?post=11765"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}